Wednesday, 5 September 2012

A ProCurve 5406zl switch is connected to port 1 of a ProCurve NAC 800 and a DHCP server is connected to port 2 of the NAC 800. You are planning to deploy the ProCurve NAC 800 with the DHCP quarantine method using a shared subnet approach. Which configuration requirement must be satisfied? | DHCP Server

A. The quarantine and non-quarantine subnets defined on the NAC 800 must be the same.
B. The switch requires that separate VLANs be defined for the quarantine and non-quarantine subnets.
C. Each switch VLAN supporting the endpoints must use a single IP helper set to the IP address of the NAC 800.
D. The scope on the DHCP server and the quarantine subnet on the NAC 800 must use non-overlapping IP addresses.

Answer: D

No comments: